summaryrefslogtreecommitdiff
path: root/tools/perf/scripts/python/call-graph-from-postgresql.py
diff options
context:
space:
mode:
authorVitaly Kuznetsov <vkuznets@redhat.com>2016-06-09 17:08:56 -0700
committerGreg Kroah-Hartman <gregkh@linuxfoundation.org>2017-04-27 09:09:32 +0200
commit567dd48c4e71a8d6d3014adb153993ef8608722c (patch)
tree4fbd1e1f2e6df2827854e8005b6ab6784ea0f09b /tools/perf/scripts/python/call-graph-from-postgresql.py
parent5ab982a01201749f49b5a6a23b45b20a03490ce5 (diff)
Drivers: hv: get rid of timeout in vmbus_open()
commit 396e287fa2ff46e83ae016cdcb300c3faa3b02f6 upstream. vmbus_teardown_gpadl() can result in infinite wait when it is called on 5 second timeout in vmbus_open(). The issue is caused by the fact that gpadl teardown operation won't ever succeed for an opened channel and the timeout isn't always enough. As a guest, we can always trust the host to respond to our request (and there is nothing we can do if it doesn't). Signed-off-by: Vitaly Kuznetsov <vkuznets@redhat.com> Signed-off-by: K. Y. Srinivasan <kys@microsoft.com> Signed-off-by: Sumit Semwal <sumit.semwal@linaro.org> Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>
Diffstat (limited to 'tools/perf/scripts/python/call-graph-from-postgresql.py')
0 files changed, 0 insertions, 0 deletions