summaryrefslogtreecommitdiff
path: root/kernel
diff options
context:
space:
mode:
authorVincent Guittot <vincent.guittot@linaro.org>2015-10-26 18:14:50 +0100
committerAmit Pundir <amit.pundir@linaro.org>2016-09-14 14:58:22 +0530
commita4ec0d1620b9e63e935744602da953feaaaac02f (patch)
tree48690611f6e10e3a81f1d9faf0bf975374112b51 /kernel
parent9a379e95dbeefbb8b891aae0192b899c6d617d94 (diff)
sched: rt scheduler sets capacity requirement
RT tasks don't provide any running constraints like deadline ones except their running priority. The only current usable input to estimate the capacity needed by RT tasks is the rt_avg metric. We use it to estimate the CPU capacity needed for the RT scheduler class. In order to monitor the evolution for RT task load, we must peridiocally check it during the tick. Then, we use the estimated capacity of the last activity to estimate the next one which can not be that accurate but is a good starting point without any impact on the wake up path of RT tasks. Signed-off-by: Vincent Guittot <vincent.guittot@linaro.org> Signed-off-by: Steve Muckle <smuckle@linaro.org>
Diffstat (limited to 'kernel')
-rw-r--r--kernel/sched/rt.c49
1 files changed, 48 insertions, 1 deletions
diff --git a/kernel/sched/rt.c b/kernel/sched/rt.c
index 8ec86abe0ea1..9694204660b7 100644
--- a/kernel/sched/rt.c
+++ b/kernel/sched/rt.c
@@ -1426,6 +1426,41 @@ static void check_preempt_curr_rt(struct rq *rq, struct task_struct *p, int flag
#endif
}
+#ifdef CONFIG_SMP
+static void sched_rt_update_capacity_req(struct rq *rq)
+{
+ u64 total, used, age_stamp, avg;
+ s64 delta;
+
+ if (!sched_freq())
+ return;
+
+ sched_avg_update(rq);
+ /*
+ * Since we're reading these variables without serialization make sure
+ * we read them once before doing sanity checks on them.
+ */
+ age_stamp = READ_ONCE(rq->age_stamp);
+ avg = READ_ONCE(rq->rt_avg);
+ delta = rq_clock(rq) - age_stamp;
+
+ if (unlikely(delta < 0))
+ delta = 0;
+
+ total = sched_avg_period() + delta;
+
+ used = div_u64(avg, total);
+ if (unlikely(used > SCHED_CAPACITY_SCALE))
+ used = SCHED_CAPACITY_SCALE;
+
+ set_rt_cpu_capacity(rq->cpu, 1, (unsigned long)(used));
+}
+#else
+static inline void sched_rt_update_capacity_req(struct rq *rq)
+{ }
+
+#endif
+
static struct sched_rt_entity *pick_next_rt_entity(struct rq *rq,
struct rt_rq *rt_rq)
{
@@ -1494,8 +1529,17 @@ pick_next_task_rt(struct rq *rq, struct task_struct *prev)
if (prev->sched_class == &rt_sched_class)
update_curr_rt(rq);
- if (!rt_rq->rt_queued)
+ if (!rt_rq->rt_queued) {
+ /*
+ * The next task to be picked on this rq will have a lower
+ * priority than rt tasks so we can spend some time to update
+ * the capacity used by rt tasks based on the last activity.
+ * This value will be the used as an estimation of the next
+ * activity.
+ */
+ sched_rt_update_capacity_req(rq);
return NULL;
+ }
put_prev_task(rq, prev);
@@ -2212,6 +2256,9 @@ static void task_tick_rt(struct rq *rq, struct task_struct *p, int queued)
update_curr_rt(rq);
+ if (rq->rt.rt_nr_running)
+ sched_rt_update_capacity_req(rq);
+
watchdog(rq, p);
/*